|
Al Hugayet Contracting Division aims to provide a complete
Engineering and Contracting Service to the industry, namely
Procurement, Planning, Installation, Commissioning and
Maintenance of Instrumentation, Mechanical and Electrical
Systems for both commercial and industrial.
Al-Hugayet has established a track record in the Kingdom not
only with the commercial sector, but also with Saudi Aramco,
Sceco, Royal Commission for Jubail and Yanbu and with Sabic all
whom are currently clients.
We have Successfully completed Electrical & Mechanical
installation projects at Sceco Headquarters, Dammam, The Saudi
American Bank, Dammam, King Faisal International Airport, Jubail
Industrial Waste Water Treatment Plant and Petromin Shell
Refinery Company Limited. In addition to the above, We
have performed Electrical, Mechanical and Instrumentation Pre-
Commissioning Services for Saudi Aramco under successive
contract since 1984 and the present contract is due for
completion in 2006. Pre- commissioning services have been
performed for other clients including Sadaf, Ghazlan Power
Plant, Umm-Lojj, Desalination Plant, Layla Power Station and in
Petrokemya.
Al-Hugayet was totally involved in providing Electrical,
Mechanical and Instrumentation maintenance and Technical
services for Petromin Shell Refinery Co., Saudi Yanbu
Petrochemical Co. (Yanpet), Arabian Oil Company (A.O.C), Saudi
European Petrochemical Co. (Ibn Zahr), Arabian Petrochemical Co.
(Petrokemya), Eastern Petrochemical Co. (Sharq) and Saudi
Methanol (Ar Razi).
Al-Hugayet successfully and proudly completed the revamping
of DCS System for Sharq 1 EG Plant and for Samad Port Loading
Facilities and major DCS up-gradation job for Aramco Riyadh
Refinery. We have considerable experience in installing
specialized switching and control equipment for the power
distribution industry. Having installed shunt reactors and
SF6 switch gear of various manufacture throughout Saudi Arabia
including Umm-Lojj Desalination & Power Plant, Arrar Power
Station, Layla Power Station, Haram II, Substation & Bab Al-Alwi
(Medina), Substation # 8082 at Olaya, Riyadh and Re-inforcement
of Jubail Substation #2.
We have the following on-going renewable long-term projects
with Saudi Aramco alone to the tune of approximately SR.180
Million for providing resource-oriented services.
|
Saudi Aramco |
|
aMiscellaneous Technical Services (MTS)
|
|
a Inspection Technical Support (ITS)
|
|
a Pre-commissioning Services (PSSD)
|
|
a Construction Technical Services(CTS)
|
|
a General Consulting for Training Services (GCTS)
|
|
a Professional Consultant Services (JVC)
|
|
aSaudi
Arab Professional Services(SA) |
|
a Supplemental Manpower Services (SMS)
|
|